Air Conditioning Load Calculation

AIR CONDITIONING LOAD CALCULATION : APARTMENT AIR CONDITIONING UNITS : AIR CONDITIONER FENCES.

Air Conditioning Load Calculation

air conditioning load calculation

    air conditioning

  • A system for controlling the humidity, ventilation, and temperature in a building or vehicle, typically to maintain a cool atmosphere in warm conditions
  • air conditioner: a system that keeps air cool and dry
  • (Air-conditioned) buses fares cost a little over four times the fare of an ‘Ordinary’ route covering the same distance. Those buses have route numbers starting with A.
  • A system which can generate both temperature controlled cold and warm air via a fan.

    load calculation

  • A load calculation is performed by HVAC professionals to determine the proper size cooling and heating system for your home. It considers factors such as the size of your house, the number of windows and the area’s year-round weather. An accurate estimate is required for optimal performance.
  • A mathematical determination of how much cooling and heating (BTUs) an HVAC system must deliver for occupant safety and comfort.
  • Assessed by a dealer, the calculation factors in a number of criteria in your home (square footage, number of windows, year-round weather concerns) and determines what size components you should include as part of your total comfort system.

air conditioning load calculation – Air Handling

Air Handling Systems Design
Air Handling Systems Design
Designing an air handling system can be a challenging task given the vast arrary of systems options from which to choose. In this highly practical reference, HVAC engineers will find all the information and guidance they need to select the most cost-effective, energy-efficient system to satisfy the design requirements of a specific project. The only book available that focuses exclusively on central air handling systems, this comprehensive book explores the full range of designs for systems commonly in use today in all types of buildings. The author provides detailed information on more than 25 constant volumes, variable volume, and hybrid systems – including single zone, terminal reheat, double duct, dual conduit, and hydronic heat pump systems. In addition, the book fully examines the differences between various system types, evaluates the advantages and disadvantages of each system, reviews basic heating and cooling loads and load variations, discusses the importance of psychrometrics in system design and selection, and outlines techniques for energy conservation and system retrofitting. Of special interest are the many diagrams that clearly illustrate all types of air handling system designs.

Hendon, Avro Vulcan – Bomb-bay

Hendon, Avro Vulcan - Bomb-bay
AVRO VULCAN B MK.2 XL318/8733M

23 Feb 56 Ordered to contract 6/Acft/13145/CB/6(a) as part of the third production
order, for 24 Vulcan B2 aircraft, serials between XL317 and XL446. Built
by A V Roe and Co Ltd at Woodford, Cheshire as one of a total of 89
Vulcan B Mk.2s constructed.
12 Aug 61 First flight of XL318 at Woodford. This 1.40-hour flight was followed by
further test flights on 14 and 17 August.
30 Aug 61 Awaiting collection.
01 Sep 61 Collected from Woodford by Wg Cdr L G A Bastard, becoming the first B
Mk.2 with No.617 Squadron, then based at Scampton, Lincs. Delivered in
then standard overall white nuclear blast reflective finish.
(The aircraft movement card records XL318 as being on strength of No. 617 Sqn from 4
September 1961).
From this point a detailed service history of XL318 is given in the Form
700 for the aircraft held by the RAFM Library, Ref: B1805.
18 Sep 61 Acceptance checks completed with an air test by Flt Lt Les Lunn; Flight
Lieutenant Tony McCausland recalls ‘Most of the squadron aircrew were
watching… and were suitably impressed when he ended his display over
the airfield with a very impressive barrel roll’
23 Nov 61 Nav/Radar Flight Lieutenant Tony McCausland (see E-Mail on file) was
one of the crew for a 3hr 40 minute operational flight, Captain Squadron
Leader Lockyer.

4 Jan 62 GPI VI trials with F/Lt Peter Thompson. Diverted St Eval 4 hr 25 min.
5 Jan 62 GPI VI trials with F/Lt Peter Thompson. 4 hr 15 mins.
9 Jan 62 Training flight with S/Ldr Michael Beavis. 6 hrs 55 min.
12 Jan 62 Training flight plus overshoots and roller landings with F/Lt P.
Thompson. 3 hr 10 min.
15 Jan 62 Groupex with F/Lt R.L. Trigg. 5 hr 05 min. ©ROYAL AIR FORCE MUSEUM 2008
2
16 Jan 62 Training flight including fighter affiliation with S/Ldr Beavis. 5 hr 10 min.
16 Jan 62 Night training flight with F/Lt P. Thompson. 5 hrs 20 min.
19 Jan 62 Night GPI VI trials with S/Ldr M. Beavis. 4 hrs 15 min.
22 Jan 62 Groupex with F/Lt R. Trigg. 4 hrs 55 mins.
XL318 does not appear in the 617 Sqn Form 541 again until:
25 Apr 62 Air Test with S/Ldr M. Beavis. 2 hrs 35 min.
30 Apr 62 Navigational flight with F/Lt Trevor Hurrell. 5 hrs 20 mins.
2 May 62 RBS calibration and nav training flight (F/Lt A. Tate). 4 hrs 40 mins.
One auto mach trim actuator ran away during climb through FL200.
07 Jun 62 No.617 Squadron at full complement of 8 aircraft.
25 June 62 RBS and fighter affiliation flight (F/Lt P. Thompson). 4 hrs 00 min.
27 June 62 Delivery Flight to Boscombe Down (F/Lt T. Hurrell). 1 hr 45 min.
After starting engines alternators would not synchronise.
No. 617 Sqn Form 540 summary for June 1962 records: “XL318 went to Boscombe Down…
…for Electro Magnetic Compatibility Trials.”
11 July 62 Boscombe Down – Scampton and continuation training (F/Lt L.B.
Leeder). 1 hr. 00 min.
No. 617 Sqn Form 540 summary for July 1962 records: “XL318 returned from Boscombe Down
and is undergoing change of role from conventional to Blue Steel.”
10 Aug 62 Possible flight with F/Lt T. Hurrell Blue Steel training and continuation
training. Main rudder powered flying control failure). 5 hrs 00 min. (No.
617 Sqn Form 541 states XL319, but No 1 Group Flight Safety Register
states XL318)
27 Aug 62 Navigation, RBS and continuation training. (F/Lt T. Hurrell). 4 hrs 50
min)
29 Aug 62 RCM, Fighter Affiliation, continuation training. (F/LT Hurrell). (3 hrs 55
min).
12 Sept 62 Blue Steel training profile. (S/Ldr M. Beavis). 2 hrs 10 min.
12 Sept 62 Blue Steel Training, RBS and continuation training. (F/Lt P. Thompson).
4 hrs 40 min).
14 Sept 62 Flight with Blue Steel Training Round, as briefed. Continuation training. ©ROYAL AIR FORCE MUSEUM 2008
3
(F/Lt A Tate). 4 hrs 50 mins.
18 Sept 62 Flight with Blue Steel Training Round, as briefed. Continuation training.
(F/Lt L. Leeder). 3 hrs 20 min).
25 Sept 62 Sqn Cdr’s check flight (W/Cdr L.G.A. Bastard and S/Ldr D.R. Carr).
2 hrs 50 min. (S/Ldr Carr and crew had only just joined the Squadron).
Whilst cruising at FL 430 No. 4 alternator came off line. (No. 1 Group
Flight Safety Register).
29 Sept 62 Exercise Matador 2, (Fighter Command’s annual air exercise) as briefed.
(S/Ldr M. Beavis). 4 hrs 30 mins.
4 Oct 62 Astro Navigation, RBS. (S/Ldr Beavis). 2 hrs 35 min.
No. 4 alternator failed 3 hrs 30 min after take off (No. 1 Group Flight
Safety Register).
8 Oct 62 Exercise Groupex. (F/Lt L. Lunn). 5 hrs 40 min.
15 Oct 62 Flight with Blue Steel Training Round 10, as briefed. (F/Lt A. Tate).
4 hrs 15 min.
16 Oct 62 Flight with Blue Steel Training Round 10, as briefed. RBS. (F/Lt A.
Tate).
4 hrs 45 min.
17 Oct 62 Flight with Blue Steel Training Round. RBS. Continuation training.
(S/Ldr M. Beavis). 3 hrs 35 min.
18 Oct 62 Flight with Blue Steel Trai

Agriculture products inspection

Agriculture products inspection
Inspection/Surveyor/Expediters/Test/Marine Surveyor/Quality control/Vietnam/Anywhere:
Inspection – Survey – expediting Services
Agriculture – Industry – Marine Control Inspection Group (AIM Control) Worldwide is an independent inspection group acting globally and providing a complete range of inspection, quality goods control, expediting, expediters, inspectors, surveyors, inspector and consulting services to trade and Agriculture, Industry & Marine as well as governmental buying organizations, contractors, ship-owners, . . .
AIM is Agriculture – Industry – Marine Control Inspection Group, which one of the world’s leading trade inspection, trade security and certification companies, operating in close to 100 countries.
Our surveyors, inspectors have always improved their knowledge and experience more than 20 years for meeting to request of the clients with the best quality services.
ACTIVITIES:
?Inspection, Survey, Inspectors, Surveyors, Consultant Services
?Marine Survey, oil & gas inspection
?Industry Expediting, expediters
?Quality Goods Control Services
?Laboratory Testing Services
?Engineering Control & Inspection Services
?Third Party Inspection, Expediting Services
?Loss Adjuster Services
?Appraisal & Valuation Services
?Certification Services
?Project Management
?Engineering Consultant
?Quality Assurance
?Vendor inspection & Witness Services
?Expediting Services
Scope of Inspection – Survey – expediting description in details is consisting of (but not limited):
?Inspection – quality control – testing – certification (for Goods – Products, Agriculture fields)
?Inspection – survey to products, goods, cargo
?Third Party Inspection
?Inspection – survey – audit to Factory, Mill
?Inspection – survey – audit to Simple Factory
?Inspection – survey audit to Extensive Factory
?Inspection – survey to First Article
?Pre Production Inspection
? During Production Inspection/Survey
?Production Monitoring / Supervision
?Final Production Random Inspection
?Pre-Shipment Inspection / Survey
?Corporate Social Audit Inspection
?C-TPIT Audit Inspection/Survey
?Defect Sorting Services
?Witness to the production
?Inspection & supervision of goods loading/discharging
?Tally of quantity
?Testing of products & materials lab analysis aim to identify brand name, component
?Inspection of weight, quantity, condition, quality, dimension, packing, marking & export / import cargo / tally
?Testing – analysis in lab.
?Certification services
•Expediting – inspection (for Industry field) :
?Material inspection
?W.P.S & P.Q.R review
?Welder & Welding operator test
?Welding Procedure Qualification Test
?Heat Treatment Chart Review
?N.D.E(RT, UT, MT, PT)
?Visual Inspection
?Dimensional Inspection
?Assembly inspection
?Pressure Test
?Functional and Performance Test
?Mechanical Running Test
?Surface Preparation and Painting inspection
?Packing Inspection
?Field Installation and Maintenance Inspection
?Progress Expediting
?Review of Contract & Job Specification
?Review & witness of a material testing and mill certificate
?Prepare of WPQR & WPS and Welder qualification test.
?Visual inspection of welding & dimension during fabrication and installation
?Visual inspection of Surface Preparation for painting
?Perform of pneumatic & hydro’ test
?Supervisory Activities & Expedition for Shop Fabrication and Site Erection
?Experience with Code and Rule: ASTM, AWS D1.1, ASME, ANSI, API, JIS, KS, SSPC, EMA.UOP and etc
?Experience with ASME Section VIII, Division 2 Pressure Vessel Code
?Marine Surveys:
?Pre-Loading Inspection
?Cargo Tank Inspection
?Draft Survey/Inspection
?Deadweight Survey/Inspections
?Deadweight calculation
?Survey/Inspection & Issues of Ullage & Weight
?Cargo Contamination Investigations
?Measurement of LPG, LNG, Crude, Oil, VAM, BA, Methanol, PPG-3010,. . at ship’s & shore’s tanks/ tanker
?Loading / Discharge Pumping Inspection/Survey
?Tank Calibration Calculation & Issues
?Approval & Issues of Quality & Weight Certificates
?Bunker Survey/Inspection Inspection/Survey services
?Crude oil vessels Survey/Inspection
?New Ship Building Supervision – inspection
?Consumer Goods Survey/Inspection
?Hull & Machinery damages inspection/Survey
?Supervision, Survey of repairs
?Investigation & Analysis of causes & circumstances of incidents & accidents
?Paint & Coatings, Corrosion inspection, Survey
?Pre-Purchase Vessel Condition Survey/Inspection
?On-hire, Off-hire & condition Survey/Inspection
?P&I Survey/Inspection
?Dry-docking Survey/Inspection
?Superintendents
?Ship Register Survey/Inspection
?Malta Flag Inspection/ Survey
?Marine consultants
?Projects of new shipbuilding/ ship designs
?Free gas Inspection.
?Survey / Inspection of damage and / or loss to be stuffed cargo
?Loading supervision, stuffed to/discharging Survey/Inspection, intact seal condition checking
?Survey/Inspection to damage and/or loss to l
air conditioning load calculation

air conditioning load calculation

Manual N - Commercial Load Calculation
The new fifth edition of Manual N, from the Air Conditioning Contractors of America (ACCA), details the correct HVAC load calculation procedure for small and mid-size commercial buildings. This new edition addresses advances in the commercial construction industry, such as new materials, methods of assembly, and operational requirements. It provides instruction to help contractors and designers satisfy new (and often conflicting) energy, ventilation, and comfort requirements. Manual N is divided into four sections providing both a quick procedure, and a more comprehensive procedure, based on the requirements of your application.

Posted September 12, 2011 by airconditioningloadcalculationgcm

Follow

Get every new post delivered to your Inbox.

%d bloggers like this: